The development
Wind Boys is an innovative and forward-thinking team, who is focused on the development of a state-of-the-art wind farm that leverages the latest technological advancements and best practices in renewable energy production.
More detailed
1000 MW
Operational capacity
100
Planned turbine count
357 000
Households of power
€2bn
Investment spending
2 150 000 MW/h
per annum
Timeframes and Plan of Work:
Planning Phase - Month 12 - 24
In this phase, we will measure and analyze the wind in the area to determine the most suitable model of wind turbines and the ideal location for efficient energy production. We do everything to ensure that the wind farm meets the requirements of the environment and regulatory acts, in parallel we prepare a package of documents for construction, carry out design works and conduct negotiations with state institutions.
Preparation Phase - Month 1-12
The preparation phase goes hand-in-hand with the previous stage, it includes topographical surveying, geotechnical research, environmental assessment, bird, bat, sound, habitat and other expert conclusions necessary for permits and licenses.
Construction Phase - Month 12-36
The construction phase includes supply and installation of wind generators, construction of electrical infrastructure and related elements. The construction time depends on the size of the wind farm and the availability of transportation in the area.
Launch Phase – 30 days
Once the park is built, we will test it for 30 days to ensure its effectiveness and longevity

Team

Once the wind park is operational, we will monitor and maintain the turbines to ensure maximum efficiency and longevity.

Bruno Declercq
Turbine Package Team Lead
Bruno Declercq
Turbine Package Team Lead
  • The development of the Tārgale Wind Park has taken place over several years.
  • During this time, many measures have been taken not only to meet the regulatory standards required for construction, but also to reduce the impact of the park on the surrounding environment and the society.
Bruno Declercq
Operations and Maintenance Team Lead, Wind Turbine Generators
Bruno Declercq
Turbine Package Team Lead
  • The development of the Tārgale Wind Park has taken place over several years.
  • During this time, many measures have been taken not only to meet the regulatory standards required for construction, but also to reduce the impact of the park on the surrounding environment and the society.
Bruno Declercq
Turbine Package Team Lead
Bruno Declercq
Turbine Package Team Lead
  • The development of the Tārgale Wind Park has taken place over several years.
  • During this time, many measures have been taken not only to meet the regulatory standards required for construction, but also to reduce the impact of the park on the surrounding environment and the society.
Bruno Declercq
Turbine Package Team Lead
Bruno Declercq
Turbine Package Team Lead
  • The development of the Tārgale Wind Park has taken place over several years.
  • During this time, many measures have been taken not only to meet the regulatory standards required for construction, but also to reduce the impact of the park on the surrounding environment and the society.
Bruno Declercq
Turbine Package Team Lead
Bruno Declercq
Turbine Package Team Lead
  • The development of the Tārgale Wind Park has taken place over several years.
  • During this time, many measures have been taken not only to meet the regulatory standards required for construction, but also to reduce the impact of the park on the surrounding environment and the society.

Interactive Map

Explore the Rezekne Wind Park through our interactive map, which showcases the location and specifications of each turbine.

Our Wind turbines

2 150 000 MW/h
per annum planned AEP
262.5 m
Planned tip height
SANY
Turbine manufacturer
150 meters
Planned hub height
225 m
Rotor size
7 m/s
Mean wind speed
at hub height

Contact Us

If you have any questions or would like to learn more about the Rezekne Wind Park, please do not hesitate to contact us. We look forward to hearing from you.

Location
Rīga